Substations Committee Meeting Schedule
Please note: Times and locations are tentative at this time.
K0 Subcommittee
| Monday, Jan 11, 2010 |
| Time | Name | Room | Chair |
| 08:00 - 12:00 |
WG k1.1, PC37.122.1,Revision of GIS Guide 37.122.1 |
Grand Republic C |
Dave Solhtalab |
| 13:00 - 15:00 |
WG K8, PC1125 Revision of Guide for Moisture in SF6 Gas-Insulated Equipment |
Grand Republic C |
Dave Giegel |
| 15:30 - 17:30 |
WK K7, PC37.017 Standard for Bushings for HVCB and GIS |
Grand Republic C |
Devki Sharma |
| Tuesday, Jan 12, 2010 |
| Time | Name | Room | Chair |
| 08:00 - 12:00 |
WG K3, P1663.1, Application Guide for GIS 1 kv to 52 kV, C37.122.2 |
Grand Republic C |
George Becker |
| 13:00 - 17:00 |
WG5, P1677, Application and User Guide for GIL |
Grand Republic C |
Darin Penner |
| Wednesday, Jan 13, 2010 |
| Time | Name | Room | Chair |
| 08:00 - 17:00 |
WG K1,PC37.122, Revision of GIS Std. IEEE C37.122 |
Grand Republic C |
Dr. John H Brunke |
| Thursday, Jan 14, 2010 |
| Time | Name | Room | Chair |
| 08:00 - 10:00 |
WG K9, PC1416, Recommended Practice for the Interface of Gas-Insulated Equipment in Existing GIS |
Fantasia M |
Arnaud Ficheux |
| 10:30 - 18:30 |
Review and Update of Tutorial/Panel Session Slides |
Fantasia M |
Hermann Koch |
C0 Subcommittee
| Tuesday, Jan 12, 2010 |
| Time | Name | Room | Chair |
| 15:00 - 16:15 |
Substations C10 Joint with PSRC H13 Understanding Requirements and Applications of the Substation Cyber Security |
Fantasia C-D |
Sam Sciacca |
| 16:30 - 17:45 |
Substations C6 P1711 Trial-Use Standard for a Cryptographic Protocol for Cyber Security of Substation Serial Links |
Fantasia P |
Dave Whitehead |
| Wednesday, Jan 13, 2010 |
| Time | Name | Room | Chair |
| 08:00 - 09:15 |
Substations WG C2 IEEE 1613 Standard Environmental and Testing Requirements for Communications Networking Devices in Electric Power Substations
|
Grand Republic A |
John Tengdin |
| 14:30 - 18:30 |
Substations C12 P1815 DNP 3.0 Standard joint meeting with T&D |
Nutcracker 2 |
Lee Smith |
| 15:00 - 17:45 |
Substations WG C7 Joint with PSRC H7 IEEE 1588 Profile for Protection and Automation IEDs |
Nutcracker 1 |
Tim Tibbals |
| Thursday, Jan 14, 2010 |
| Time | Name | Room | Chair |
| 08:00 - 09:15 |
C9 1646 IEEE Standard Communication Delivery Time Performance Requirements for Electric Power Substation Automation
|
Pacific |
John Tengdin |
| 09:30 - 10:45 |
C0 Data Acquisition, Processing, and Control Systems Subcommittee Meeting |
Pacific |
Craig Preuss |
E0 Subcommittee
| Wednesday, Jan 13, 2010 |
| Time | Name | Room | Chair |
| 08:00 - 12:00 |
WGE6 - Grounding Testing (Std 81) |
Nutcracker 1 |
Dennis F. DeCosta |
| 13:00 - 16:00 |
WGE7 – Substation Physical and Electronic Security (IEEE 1402) |
Grand Republic A |
Hassein (Jack) Bashirian |
I0 Subcommittee
| Monday, Jan 11, 2010 |
| Time | Name | Room | Chair |
| 09:00 - 13:00 |
WG I4 Static Var Compensator |
Grand Republic D |
Hubert Bilodeau |
| 14:00 - 17:00 |
WG I4 TF1 IEEE1031 |
Grand Republic D |
Heinz Tyll |
| 14:00 - 17:00 |
WG I8 TF1 Control Architecture for Power Electronics |
Atlantic B |
Joe Sullivan |
| Tuesday, Jan 12, 2010 |
| Time | Name | Room | Chair |
| 09:00 - 13:00 |
WG I4 TF2 IEEE1303 |
Grand Republic D |
Chris Horwill |
| 09:00 - 13:00 |
WG I8 TF2 PEBB Design tools |
Atlantic B |
Ani Gole |
| 14:00 - 17:00 |
WG I8 Power Electronic Building Block Concepts |
Atlantic B |
Nari Hingorani |
| Wednesday, Jan 13, 2010 |
| Time | Name | Room | Chair |
| 09:00 - 13:00 |
WG I5 Voltage Source Converter |
Pastoral 3 |
Ben Mehraban |
| 14:00 - 17:00 |
WG I8 TF1 Control Architecture for Power Electronics |
Pastoral 3 |
Joe Sullivan |
| Thursday, Jan 14, 2010 |
| Time | Name | Room | Chair |
| 09:00 - 13:00 |
WG I8 TF1 Control Architecture for Power Electronics |
Fantasia N |
Joe Sullivan |
Each committee to confirm with Charles Henville (c.henville@ieee.org) your proposed set of
Committee/Subcommittee/Working Group/Task Force meetings for scheduling.