2010 IEEE PES
Joint Technical Committee Meeting

January 10 - 14, 2010 • Lake Buena Vista, Florida, USA

Transmission & Distribution Committee Meeting Schedule

Please note: Times and locations are tentative at this time.

Distribution Subcommittee

Sunday, Jan 10, 2010
TimeNameRoomChair
16:00 - 17:30 Distribution SC Admin Fantasia E-F Cheri Warren
Monday, Jan 11, 2010
TimeNameRoomChair
08:00 - 12:00 Distrbution Reliability WG part 1 Grand Republic B Cheri Warren
13:00 - 17:00 Distribution Reliability WG part 2 Grand Republic B Cheri Warren
17:00 - 18:00 Electrical Testing of Wildlife Protectors Grand Republic B Caryn Riley
Tuesday, Jan 12, 2010
TimeNameRoomChair
09:00 - 12:00 Working Group on Voltages at Publicly and Privately Accessible Locations Grand Republic A Chuck DeNardo
13:00 - 15:00 Distributed Resource Integration WG Grand Republic A Bob Saint
15:00 - 17:00 Switching and Overcurrent Protection WG Grand Republic A Charlie Williams
Wednesday, Jan 13, 2010
TimeNameRoomChair
08:00 - 10:00 Distriubtion Automation WG Nutcracker 2 Georges Simard
10:00 - 12:00 Volt/VAR Control TF Nutcracker 2 Tom Rizy
13:00 - 14:30 Distribution SC Nutcracker 2 John McDaniel

Power Quality Subcommittee

Monday, Jan 11, 2010
TimeNameRoomChair
15:00 - 16:00 TF on Transfer of Power Quality Data (1159.3) Atlantic A Dan Sabin
16:00 - 17:00 TF on Voltage Sag Indices (1564) Atlantic A Dan Sabin
Tuesday, Jan 12, 2010
TimeNameRoomChair
08:00 - 09:00 TF on Flicker (1453) Nutcracker 2 Reuben Burch
09:00 - 10:00 Harmonic Control on Power System TF (519) Nutcracker 2 Mark Halpin
10:00 - 12:00 Harmonics WG Nutcracker 2 Bill Moncrief
14:00 - 16:00 Voltage Quality WG (1250) Fantasia Q Dennis Hansen
16:00 - 17:00 Power Quality Solutions WG (1409 and 1346) Fantasia Q Dave Mueller
Wednesday, Jan 13, 2010
TimeNameRoomChair
09:00 - 11:00 Power Quality Subcommittee Meeting Pacific Dan Sabin
11:00 - 12:00 SCC22 Power Quality Standards Coordination Committee Pacific Bill Moncrief

Capacitor Subcommittee

Monday, Jan 11, 2010
TimeNameRoomChair
08:00 - 11:00 Series Capacitor WG Part 1 Pacific
Tuesday, Jan 12, 2010
TimeNameRoomChair
08:00 - 11:00 Shunt Capacitor Standard WG 18 Part 1 Fantasia Q
14:00 - 17:00 Series Capacitor WG Part 2 Pacific
Wednesday, Jan 13, 2010
TimeNameRoomChair
08:00 - 11:00 Shunt Capacitor Standard WG 18 Part 2 Grand Republic D
09:30 - 10:45 Joint Meeting T&C Capacitor Subcommittee and PSRC KTF4 Series Capacitor Protection. Fantasia P Mark McVey and Vahid Madani
14:00 - 17:00 Capacitor Switching application paper/ Subcomittie meeting Grand Republic D Mark McVey

Engineering in the Safety, Maintenance and Operation of Lines Subcommittee

Monday, Jan 11, 2010
TimeNameRoomChair
08:00 - 09:00 Insulator Cleaning TF CR Boardroom Carreira
09:00 - 10:00 Conductive Clothing 1067 TF CR Boardroom Schweitzer
10:00 - 12:00 Helicopter Paper TF CR Boardroom Verdecchio
13:00 - 15:00 Manual Proposal CR Boardroom Verdecchio
15:00 - 17:00 Restoration Structures TF CR Boardroom Holloman
Tuesday, Jan 12, 2010
TimeNameRoomChair
08:00 - 11:00 ESMOL Subcommittee / Smart Grid Presentation CR Boardroom Buonincontri
10:00 - 12:00 ESMO Exec. Committee Pastoral 2 Schweitzer
11:00 - 12:00 Fall Protection 1307 TF CR Boardroom Hunt
13:00 - 14:00 1654 RF TF CR Boardroom Kolcio
14:00 - 15:00 Grounding Induction TF CR Boardroom Erga
15:00 - 16:00 1048 - Grounding TF CR Boardroom King
16:00 - 18:00 Steering Pastoral 2 Buchholz
16:00 - 17:00 Arc Hazard Paper TF CR Boardroom Ivanitski
Wednesday, Jan 13, 2010
TimeNameRoomChair
08:00 - 10:00 516 Live Line TF Fantasia Q Christensen/Olson
10:00 - 12:00 516/ NESC SC8 Joint Meeting Fantasia Q Christensen/Olson/Tomaseski
13:00 - 14:00 IEC TC 78 Fantasia Q Tomaseski
14:00 - 17:00 NESC SC8 Fantasia Q Tomaseski
Thursday, Jan 14, 2010
TimeNameRoomChair
08:00 - 12:00 NESC SC8 CR Boardroom Tomaseski
13:00 - 16:00 NESC SC8 CR Boardroom Tomaseski

Towers, Poles and Conductors Subcommittee

Sunday, Jan 10, 2010
TimeNameRoomChair
13:00 - 15:00 High Temperature Effects TF Meeting Fantasia A-B Jerry Reding
13:00 - 15:00 Ground Rod Standard TF Meeting Fantasia C-D Roger Montambo
13:00 - 15:00 IEEE 524 Revision TF Fantasia E-F Randy Hopkins
15:00 - 17:00 Fastners, Pole Line Hardware, Wood Design Guide Fantasia K Bob Peters
15:00 - 17:00 IEEE Standard 738 Revision TF Meeting Fantasia A-B Dale Douglass
15:00 - 17:00 Practical Discussion on Vibration TF Fantasia C-D Nancy Fulk
Monday, Jan 11, 2010
TimeNameRoomChair
08:00 - 09:00 Special Session “Lightning Protection of Lines 101” Grand Republic A Glenn Davidson/Bill Chisholm
09:00 - 10:00 Special Session “Detecting impending failures in OH Lines” Grand Republic A Glenn Davidson
10:00 - 12:00 Line Design Methods WG Meeting Grand Republic A Rich Collins
13:00 - 15:00 Construction of OH Lines WG Grand Republic A Doug Proctor
15:00 - 17:00 OH Line Materials and Hardware WG Meeting Grand Republic A Bob Peters
17:00 - 18:30 TP&C/ESMOL Newcomers meeting Olympus A-B Glenn Davidson
Tuesday, Jan 12, 2010
TimeNameRoomChair
08:00 - 10:00 Conductors WG Meeting Ballroom of the Americas A Craig Pon
10:00 - 12:00 Coordination of TP&C and NESC WG Meeting Ballroom of the Americas A Nelson Bingel
13:00 - 17:00 Corrosion WG Meeting Ballroom of the Americas A Neal Murray
Wednesday, Jan 13, 2010
TimeNameRoomChair
08:00 - 10:00 Corona and Field Effects WG Meeting Ballroom of the Americas A Dave Phillips
10:00 - 12:00 Management of OH Lines WG Meeting Ballroom of the Americas A Andy Stewart
13:00 - 14:30 TP&C Subcommittee Meeting Ballroom of the Americas A Glenn Davidson
14:30 - 16:00 TP&C/ESMOL Joint Subcommittee Meeting Ballroom of the Americas A Glenn Davidson/Tom Buonicontri

Lightning and Insulator Subcommittee

Tuesday, Jan 12, 2010
TimeNameRoomChair
08:00 - 09:00 Lightning Performance of Overhead Lines Grand Republic A John McDaniel
08:00 - 09:00 15.09.09.08 – Task Force for a Recommended Practice on Insulator Loading Atlantic A Tony Baker
09:00 - 09:30 15.09.04.02: Task Force on Corona Testing of Hardware & Insulators Atlantic A Dr. John Kuffel
09:30 - 10:00 15.09.03.03 – Task Force on Electric Field Modeling of Nonceramic Insulators Atlantic A Dr. Andrew Phillips
10:00 - 12:00 15.09.04.01 – Guidelines for the Classification of the Live-line Working Condition of Distribution and Transmission Insulators - NCI Atlantic A Tony Carreira
13:00 - 13:30 15.09.09.03: Icing Test Methods and Mitigation Techniques Atlantic A Masoud Farzaneh
13:30 - 14:30 15.09.03.04 – Task Force on Bird Related Outages Atlantic A Dr. Raji Sundararajan
14:30 - 18:00 Insulator Performance of Overhead Lines WG Atlantic A Allen Bernstorf

Integration of Renewable Energy into the Transmission and Distribution Grids Subcommittee

Monday, Jan 11, 2010
TimeNameRoomChair
14:00 - 16:00 Wind Plant Collector System Design WG Pacific Mitch Bradt
Wednesday, Jan 13, 2010
TimeNameRoomChair
16:00 - 17:00 Integration of Renewable Energy into the Transmission and Distribution Grids Subcommittee Fantasia L Ernst Camm

Main Committee

Wednesday, Jan 13, 2010
TimeNameRoomChair
08:00 - 12:00 NEMA High Voltage Insulator Technical Committee Meeting Atlantic A Scott Choinski
13:00 - 17:00 ASC C29 Insulators for Electric Power Lines Pacific Jack Varner

C0 Subcommittee

Wednesday, Jan 13, 2010
TimeNameRoomChair
14:30 - 18:30 Substations C12 P1815 DNP 3.0 Standard joint meeting with T&D Nutcracker 2 Lee Smith

Each committee to confirm with Charles Henville (c.henville@ieee.org) your proposed set of Committee/Subcommittee/Working Group/Task Force meetings for scheduling.


©2010 Conference Management Services, Inc. -||- email: webmaster@pestechnical.org -||- Last updated Monday, December 21, 2009